How Marketing Teams Protect Strategic Work From Urgent Requests

Marketer Magazine25 min read

Urgent requests can quickly pull marketing teams away from work that drives long-term results. Insights from marketing experts show how to separate true priorities from distractions using deadlines, customer impact, revenue, and risk. The article explains practical ways to protect focus while responding to work that genuinely cannot wait.

§ How this was made

The perspectives in this article were written by the named contributors and submitted through Connectively. Connectively's automated system selected them and used AI to write the headline, introduction, section headings, summary sections, and illustration, and to make minor edits for clarity. Articles are assembled and published automatically. Report errors to corrections@connectively.us. How we make our content

Illustration generated with AI

What the experts said

  1. Use Existing Assets for Live NeedsJAJessalyn Arthur Taveras

Reserve Capacity for Unplanned Work

TH

Tristan HarrisSr. VP of Marketing · Next Net Media

"Can you just quickly..." may be the most expensive phrase a marketing team hears. Each one feels small, but they add up until the planned work only gets done in whatever time is left over. The rule that's helped most is a fixed weekly budget for unplanned work. A set portion of the team's week is held back for anything that comes up without notice. Until that time is used, urgent requests go straight in. Once it's full, a new request has to replace something already on the list, and the person asking helps choose what moves. That changes the conversation right away. People start asking themselves whether the request is worth bumping something else, and many decide it can wait for the next planning cycle. Real opportunities still get through, like a timely press query or a customer problem, because there's always room set aside for them. The planned work stays protected, because the limit is visible to everyone and nobody has to argue for it each time.

Use Revenue and Deadline Tests

AL

Alec LoebVP of Growth Marketing · EcoATM

When urgent requests keep interrupting a marketing team's planned work, how do you decide what needs an immediate response and what can wait?

I ask one question first. Does this request tie to revenue or a deadline within 48 hours?

If yes, we jump on it. If no, it goes into a queue we review twice a week.

What boundary or prioritization rule has helped your marketing team protect important work without missing a real opportunity?

We keep one open slot each week for surprise work. A carrier promo that changes overnight is a good example, since phone trade-in prices move fast and we need fresh messaging up quickly.

Anything outside that slot has to swap with something already on the plan. The requester sees what gets bumped.

That one step kills most fake emergencies. People rethink how urgent something is when it costs them something.

The real opportunities still get through, and the planned work stays on track.

Require Concrete Delay Consequences

BV

Bryan VasquezHead of Sales · LinkBuilder.io

Urgency on a growing team usually means information is arriving late. A launch date known for a month only reaches marketing two days out. So the test I use is simple: what specifically is lost if this waits 48 hours? Every urgent request now includes one sentence answering that question. When the answer is concrete, like losing a media placement, missing a product release window or leaving a customer issue unresolved, the team acts right away. When the answer is vague, like "leadership would like to see it," it goes into the regular queue. Writing that sentence takes about thirty seconds, and it filters out a surprising number of requests on its own, because people often realize while writing it that nothing actually depends on speed. It also gives the team a record. After a few months, you can see which departments keep sending late requests and work with them on earlier handoffs, which protects planned work far better than any amount of saying no.

Enforce Intake Forms and Triage

BG

Brandon GeorgeDirector of Demand Generation & Content · Thrive Internet Marketing Agency

Send every incoming request through one intake form with three required answers: what revenue or customer experience is at risk, what the deadline is, and what happens if the work waits for the next planned window. A request that answers all three gets triaged. A request with a blank answer goes into the queue. The form removes the most common source of false urgency, which is a message that feels pressing only because it arrived loudly. It also creates a record. After a month, the team can see how many requests were marked urgent and how many actually were, which shows whether the definition is too loose. I would assign a triage owner each week to read the forms, sort the requests, and bump one into planned work only if its answers justify it. The planned block stays protected, and the triage owner is the only person who can break it. For missed opportunities, I would include a field asking whether a prospect is waiting for a reply, so a sales-driven request does not sit behind a design revision. The rule I would follow is that no request interrupts the plan without a completed form and an approving triage owner.

Apply One-In, One-Out Triage

CR

Chris RoyProduct and Marketing Director · Claimsline

Having run the Digital teams at Auto Trader UK and AutoConvert before joining Claimsline, I've always applied an 'issues' or 'bug fixes' triage approach to ad-hoc requests, trying to identify if there were true fires to put out. So I would ask if any key funnel, page or process was currently compromised and likely losing motorists or providing inaccurate information. This could range from anything as simple as a pixel not firing correctly to increased volumes for particular keywords. Anything else would be considered non-urgent, and added to a list to agree priorities for time available over the following week.

I therefore impose a 'One in, one out' rule, alongside a quantum of time always reserved to react to any hot issues. If someone feels strongly that something else should be brought in and done now, then I ask them to identify what current plan of work would be sacrificed as a result. Not only does this filter out many pseudo fires, but it also avoids continual diversion away from more strategic SEO, site and other improvements, and ensures spare resource if something genuinely beneficial came along.

Score Requests by Urgency and Impact

JG

Jimi GibsonVP of Brand Communication · Thrive Internet Marketing Agency

Our team runs every task through a simple 2x2 urgency-versus-impact grid.

We combine revenue impact and strategic alignment into a single impact score. Requests get scored 1 to 5 across speed and overall impact. Level-5 emergencies (scoring a 5 for urgency and carrying immediate business consequences like technical downtime, public brand risks or broken conversion pages) immediately trigger technical alerts. That quick triage resolves 98% of critical site issues within two hours. We also fast-track time-sensitive opportunities with fixed external deadlines. We do this even if immediate ROI is hard to quantify. All high-effort asks under a 3 move to the weekly backlog. This single rule protects roughly 35 hours of core work per strategist weekly.

We protect this workflow by setting four dedicated two-hour deep-work blocks each week. They run Tuesday to Friday from 9:00 AM to 11:00 AM. Production teams disconnect from email, Google Chat and phone alerts during these hours. To ensure we do not miss big opportunities, all requests route through a quick intake form. Two team leads review every entry. They spot real emergencies or tight deadlines before reaching out to a strategist. This boundary eliminated random interruptions during key execution hours. It also drove our on-time deliverable rate from 74% up to 92% across our team of 40+ people.

Check Requests Against Confirmed Constraints

Most of what arrives as urgent is a question we have already answered and not written down. So the boundary I keep is a single config file that holds every settled decision, and an urgent request gets checked against it before anybody reopens it.

The file is short and deliberately boring. Who the buyer is. Which languages we build in and in what order. Which cities are in scope. What the business does not sell. The rule is written at the top: every line in it is something the owner said, something the project brief already states, or something measured live and cited, and nothing in it was inferred by a build. So a request that contradicts it stops being a priority question and becomes a change request with a named owner.

The second half of the boundary is the one that saves the week. The file carries its own hold: nothing downstream may run until the owner confirms sections 2, 3, 5 and 9, the sections that set language, geography, the services taxonomy and the open rulings. An urgent ask that touches a confirmed section gets done. An urgent ask that touches an unconfirmed one goes to the owner as a decision, not to my team as work.

The habit came from paying for the alternative. One excluded topic was seeded into a keyword tool because it sounded adjacent, and that single seed pulled 7,500-plus irrelevant riad and hotel keywords into a plan for a business that does not sell them. The standing constraint written afterwards is one line: never seed riad, in any language, in any spelling. It reads like pedantry until you have spent a day cleaning the output.

What gets dropped rather than queued is also written down. Nothing is cut for being hard; things are cut for being irrelevant or for having no demand at all. That sentence settles more arguments about urgency than any priority matrix I have used, because it moves the conversation off who asked and onto whether the work can matter.

Define Urgency and Protect Focus

TC

Timothy ClarkeSenior Reputation Manager · Thrive Local

Start by defining urgent in writing, because most interruptions feel urgent in the moment. In my team, a request qualifies only if it puts revenue or a live customer experience at risk within 24 hours: a broken landing page or ad, a client escalation with a hard deadline, or an outage that stops lead capture. Everything else waits for the next communication window. I keep a visible calendar with deep work from 9 AM to 12 PM and communication from 12 to 1 PM and again from 4 to 5 PM, and the team can see it. That visibility matters, because people can plan a request around the window instead of sending it into focused time. Non-urgent requests get batched into those windows, which lets a designer or analyst finish a block before responding. The one real exception is a dedicated urgent channel that someone checks throughout the day, so a true emergency never waits for a window. To avoid missing a real opportunity, I apply a standing rule: if a deal or campaign could close within a day, the request moves to that channel, not the queue. Review the definition of urgent every month, since a slow season and a launch week need different thresholds. The closing rule is to write down what counts as urgent before the interruptions begin.

Require Investor Meeting Dates

DT

Drushi ThakkarSr. Creative Strategist · Qubit Capital

Our content lead counts a request as urgent only when an investor meeting depends on it. That meeting has to have a date. The requests come from colleagues whose whole job is getting founders in front of investors.

Anything tied to a meeting date gets a reply within the hour. Everything else waits in a queue we clear on Tuesday and Thursday afternoons. AI tools now write most first drafts, so a draft takes minutes. Saying yes feels free, though the editing never is. You would be surprised how many requests stop being urgent once someone asks for the meeting date. Maybe the rule is too strict for breaking news with no meeting attached. Our request sheet says the truly urgent case turns up about twice a month.

Prioritize Live Clients and Timely Stories

LB

Lisa BennettDirector, Sales & Marketing · DoJiggy

My rule is that anything affecting a client's live campaign gets attention right away. If a school or nonprofit is in the middle of a fundraiser and needs help, that comes first. Most other marketing requests can wait for the right time in the day.

Protecting time for planned work helps a lot. My afternoons are set aside for content and SEO, the kind of work that keeps bringing people to us over time. Meetings, demos, and quick conversations with the sales team fit into the morning. When the day has that shape, it's easier to say, "I'll get to that tomorrow morning," and keep moving.

I also keep an eye out for opportunities worth jumping on. A great client story is one of them. When my cousin told me her daughter's school was using DoJiggy to raise money for a student trip to Japan, that was the kind of thing worth sharing while it's fresh, because real stories connect with people. So I ask whether something helps a client right now or gives us a timely story to tell. If it does neither, it can wait.

Protect Accuracy and Safety First

The rule I work by: a request jumps the queue only if waiting would make us less accurate or less safe, or if the window really does close. Everything else goes into the plan.

I run PR for FastHer, a fasting timer for women with a squad of little food-friend characters, and in wellness marketing the "urgent" requests usually arrive dressed as opportunities. A trending sound, a hot take about what fasting supposedly does to your body, a quick quote someone wants by tonight. The trend feels like it will vanish tomorrow, so it's tempting to drop the planned work and chase it.

The first question I ask isn't "how fast can we ship this?" It's "does this need a claims check?" If a post or a quote would say anything about the body, it gets reviewed before it goes out, even if that means we miss the moment. A health claim made in a hurry costs far more than a missed trend.

The boundary that protects our planned work is a short list of things that are always urgent, agreed before anything comes up: 1. A journalist on a real deadline asking something we can answer honestly. 2. Correcting a mistake or a misleading impression about the product. 3. Safety messaging. Fasting isn't right for everyone, and anyone who is pregnant, breastfeeding, diabetic or has a history of disordered eating should talk to their doctor first. If that line is missing somewhere, fixing it can't wait.

If a request isn't on the list, it waits for the weekly planning slot. Because the list exists ahead of time, nobody has to argue about urgency in the moment. You just check it.

The other filter is being honest about what counts as a real opportunity for a brand that's still coming soon to Google Play. We can't chase anything that needs results, user numbers or testimonials we don't have, and that alone removes a surprising number of "urgent" ideas. What's left is usually the slower, more important work, like the anti-shame messaging in our guide on how to stick with intermittent fasting (https://fasther.com/2026/11/13/stick-to-intermittent-fasting/), where breaking a fast early is never treated as failing.

Honor External Deadlines, Verify Sources

RM

Richard MeadowsHead of Content · Streamrise

The boundary that has helped us most is a simple sorting question: does this request have a deadline that someone outside our team controls? If yes, it can interrupt planned work. If the urgency is only that someone wants it sooner, it waits for the next planning slot.

I should be clear about where this comes from. We are a small team, and I have no before-and-after numbers on interruptions. What I can describe is the one thing we treat as non-interruptible, because we learned it the hard way: the check of a claim against its source.

In a public answer I once wrote threshold figures from memory, and they did not match the live help page. I corrected them. Since then, anything that states a fact about someone else's product or rules is checked against the live page before it goes out, and the date of the check is recorded. A request that says "we need this today" does not change that; it changes which piece goes first, not whether the check happens.

What this gives a marketing team in practice: 1. Two lists, not one: requests with an external deadline, and requests that are merely impatient. Only the first list is allowed to break into the plan. 2. One step that is never traded away for speed. Ours is source verification. Yours might be legal review or brand approval. Naming it in advance means nobody has to argue it in the moment. 3. A real opportunity is not missed by the second rule, because a checked answer a day later usually still beats an unchecked one today.

The limit: I have not tested the opposite policy, so I cannot say how much opportunity the boundary has cost us.

Test Opportunities for Hard Expiration

Running ferry sales means every summer day is a live operation. A sold-out sailing, a weather shift, a last-minute group of 30 needing tickets -- the interruptions are relentless and real money is on the line.

The rule I live by: does this interruption have a hard expiration? Group inquiries for a specific weekend sailing expire fast -- seats fill, and that revenue walks. A request to redesign our group sales flyer does not expire today. That distinction does most of the sorting for me.

For example, when a corporate group reaches out wanting 25+ tickets for a peak summer weekend, that gets same-day attention -- those sailing slots are genuinely finite. But a request to rethink how we position our Block Island Getaway Packages? That goes into a protected planning block, not the interruption queue.

The practical boundary I'd share: build a simple two-question filter -- "Does waiting 48 hours kill the opportunity?" and "Is this reversible if we respond tomorrow?" If the answer to both is no, it waits. That filter alone keeps the high-value planned work alive without making your team feel like they're ignoring real business.

Validate Opportunities Before Interruptions

HS

Heath SquierCMO | Founder · EVKII

I give an urgent request priority when delay would close a relevant opportunity and the team can produce the required work accurately. A deadline is one test, not the whole decision. Source fit, usable evidence and permission to deliver the requested format are gates.

Our earned-media campaign gives a concrete example. An interested reporter's written question goes ahead of another round of new pitching, because there is already a specific editorial need to resolve. But an invitation that lacks questions, length, a current deadline or authorship terms is not yet a writing assignment. We ask for those missing details once, record what is unanswered and set the next review date. We do not keep interrupting the queue to send the same reminder.

The boundary that protects planned work is separating the next action from the desired outcome. A reply asking for the brief may be urgent and small; promising an exclusive article, interview or product shipment is a different decision. If the requested participation is outside our written-only scope, its short deadline does not make it eligible.

I would put four fields on an interruption: the consequence of waiting, the exact deliverable, the evidence already available and the person who can resolve the missing decision. If no one can state those, clarify before moving a planned task. Once the boundary is clear, finish the small authorized action and return to the queue.

This describes our campaign's actual prioritization rules, not a claim that they increased output or produced a particular press result. The practical gain is an inspectable next step: answer, request the missing brief, schedule review or decline the format. Urgency should change the order of valid work; it should not erase the conditions that make the work valid.

Address Critical Conversion Failures First

Between my 10 years in the U.S. Air Force and leading Cleaning Business Growth, I learned that constant reactivity destroys strategic momentum. Our firm boundary is that an unscheduled request only jumps the line if it represents a critical system failure halting live lead conversion.

If a client's quote form breaks or a Google Ads tracking issue stops incoming calls, we address it immediately to protect active revenue. If the request is a cosmetic change, a new campaign idea, or an ad copy tweak, it is routed to our standard weekly sprint.

In our Clean Growthtm Framework, we avoid changing multiple variables mid-flight because frequent interruptions corrupt performance data. Enforcing this triage boundary keeps our team focused on foundational growth while still catching true operational emergencies.

Prioritize Real Dates and Customer Loss

MW

Mattie WordemanMarketing and Communication Specialist · University of Wyoming University Store

An urgent request is only urgent if the calendar backs it up, and on a campus store the calendar is usually pretty clear about what actually matters.

My test is simple: is there a real date attached, and does a shopper lose something if the message waits? If a home game is Saturday and someone flags that a shipping cutoff changed, that goes out today. If someone wants a new graphic "sometime this week" because a good idea came up in a meeting, it goes on the list and gets a reply by end of day about when I can get to it. Most things that feel urgent are really just loud. A teammate at the register in the Wyoming Union telling me students keep asking where the used textbooks are is different. That's a customer problem happening right now (and it'll still be happening in an hour if I don't move), so I treat it as immediate.

The boundary that protects my planned work is small. I keep most mornings blocked off from new requests, and anything that lands during that time gets a quick note saying when I'll look at it. Sounds minor, but it kept me from dropping a Homecoming plan halfway through to chase something that turned out to be completely fine a day later.

I also ask myself one question before I let something wait: what happens if this goes out Friday instead? If the honest answer is nothing, it waits. If the answer is a missed game weekend, or a parent who can't get a first-year's dorm order in time, it doesn't.

That question keeps me from missing real opportunities too, because a good one almost always comes with a deadline attached. Something already moving on our feed and tied to kickoff gets space. A vague "can we do something with this" gets a date first.

Protect the plan by asking what the delay actually costs, not how loud the ask is.

Trade New Work for Existing Work

DG

Daniel GohChief Marketing Officer · RankAISearch

1. Ask yourself this simple question first: will this be worth less if we handle it tomorrow? Reporter queries close at night, pages fall off Google, sites can't be read by AI crawlers after a simple plugin upgrade - all of these things are worth less than zero very quickly. Stuff like "refresh homepage" or "write about AI for me" has the same value on Thursday as it does right now. I tracked every single interruption for two weeks at RankAISearch in a simple spreadsheet. What I found out was that almost all of them could have waited 24 hours with zero negative impact. This was a tiny sample size from a tiny team, but it has had a significant impact on my reaction to "urgent" ever since.

2. The single biggest thing that has helped us with this is: nothing new is added until something else is removed from the list. If someone wants to add something new to the list of things to do, they have to offer something in return - i.e., agree to move something else back down the list. Usually they decide it can wait.

Mornings are reserved for our one planned project for the week, be it a YouTube walkthrough or an audit write-up. All requests go into our one chat window for the team and are dealt with after lunch.

Yes, there are real opportunities that need to get through to you. They are usually stated in a manner that is different from the noisemakers listed above.

Test this for free this week. Write down every interruption to see how many would still be relevant the next day. Your numbers will reveal a boundary that is far easier to uphold than any rule.

Prioritize Irrecoverable Client Deadlines

Running a small financial services firm where I'm personally handling tax deadlines, client insurance questions, bookkeeping issues, and business formation requests simultaneously -- I live this problem daily.

The rule that saved us: if the request is client-facing and time-sensitive by law or calendar -- a tax filing deadline, an open enrollment window closing, a same-day IRS response -- it moves immediately. If it's internal marketing work that can survive a 24-hour hold without a client losing money or missing a window, it waits for a protected block.

The clearest example from our world is ACA open enrollment. When that window is closing and a client needs health coverage confirmed, no marketing task outranks it -- full stop. But a social post, a blog draft, an email sequence revision? Those live in scheduled blocks that interruptions simply don't touch, the same way we protect estimated tax deadlines on a client's calendar.

The question I ask my team: "Does someone lose something real and unrecoverable if we respond tomorrow?" Real opportunity has a hard external deadline you didn't set. Everything else is urgency someone invented.

Serve Active Customers Before Future Pipeline

VS

Vaughn SmithMarketing Director · Smith Automotive Group,

Running marketing across three dealerships means my team gets pulled in a dozen directions before lunch. The filter I use is simple: does this interruption affect a customer who is already in motion, or is it about creating future motion?

A customer who submitted a lead, booked an appointment, or is mid-deal gets an immediate response. Everything else gets slotted. A vendor pushing a last-minute ad placement or an internal request for a one-off social post can wait until we finish what's already in flight.

The rule that actually protects the team is this: reactive work serves existing customers, proactive work builds future pipeline, and neither one should eat the other. When those categories blur, the urgent-but-unimportant stuff always wins by default.

So we block time for campaign builds, reporting, and strategy the same way the sales floor blocks time for deliveries. You don't pull a salesperson off a delivery to answer a cold call. Same logic applies to marketing.

Protect Campaigns From Internal Preference Shifts

DC

Dawn ColleaMarketing Director · Ninefold Pest

Running marketing for a pest control company across four states means urgent requests are constant -- a technician spots a new pest trend in Virginia Beach, a local competitor drops pricing in Utah, someone wants same-day social content. Early on, I let those interruptions run the calendar. That's how planned campaigns die quietly.

The rule that actually changed things: I ask whether the request is time-sensitive by nature or just feels urgent to the person asking. A same-day service opportunity for a customer mirrors what we do operationally with our Inspect-Protect-Prove model -- there's a real window that closes. A last-minute request to "post something about mosquito season" usually isn't that. The season doesn't expire by Friday.

The boundary I protect hardest is what I call the "already-in-motion" rule. If a campaign is mid-execution -- content written, sequence live, assets placed -- it takes a genuine external trigger to interrupt it, not an internal preference shift. I've watched solid SEO and content work get abandoned halfway through because someone got excited about a new idea. Half-finished work in marketing compounds the same way a half-treated flea infestation does: you think you're done, then three weeks later the problem's back worse than before.

Practically, I keep a visible "pending, not urgent" list that gets reviewed once a week as a team. It gives people a place to put ideas without feeling ignored -- and it's where most "urgent" requests land once they've had 48 hours to cool down.

Use Existing Assets for Live Needs

JA

Jessalyn Arthur TaverasFounder & Strategic Director · ARKO Agency & Consulting,

Having spent over a decade leading marketing initiatives from brand campaigns to commercial systems at ARKO, I tie every prioritization decision directly to the live operational reality. My rule is simple: an urgent request only interrupts planned roadmap work if it directly impacts immediate operational revenue, such as sudden product margin shifts, inventory rotation needs, or live booking updates.

When we build content systems and visual libraries for hospitality brands like Macchialina in Miami, we pre-produce assets across foundational pillars in advance. Because we already have high-value creative mapped to the customer journey, unexpected promotional requests are solved using our existing library rather than derailing active strategy work.

Any ad-hoc idea that doesn't solve an immediate commercial friction point gets routed into our planned content cycles to be repurposed across multiple formats. This boundary protects our focus on scalable growth systems while ensuring real commercial opportunities never get missed.

Prioritize Live Customer Breakages

SD

Snket DesaiDirector of SEO & Chief Branding Officer · Spot Easy

At Spot Easy, urgent requests used to pull the whole team off planned work, and we'd end the week busy but with nothing important finished. So we made one rule: an interruption gets an immediate response only if it affects something live — a broken page, a wrong price or availability, or a promise we've already made to customers.

Everything else goes into a short queue and gets looked at once a day, not the moment it arrives. That pause matters, because most urgent-sounding requests turn out to be important but not time-sensitive, and a few hours of distance makes that obvious.

The boundary that protects the planned work is our weekly plan. We agree the week's priorities in advance, and we don't swap them out for a new request unless it passes that live test. If it doesn't, the person asking gets a clear yes or no and a date, instead of a vague promise.

The habit that helped most was asking one question back: what breaks if this waits until tomorrow? If the honest answer is nothing, it waits. We miss far fewer real opportunities now, because the team actually finishes the work that was meant to matter.

Preserve Profitable Campaigns During Tests

IS

Ishant SharmaFounder and Google Ads Specialist · Hustle Marketers

Our rule is simple: anything that stops revenue gets a same-day response, and anything that changes how a campaign learns waits for the weekly plan. Broken conversion tracking, a disapproved product feed or a suspended Merchant Center account can't wait, because every hour costs sales and feeds bad data into automated bidding. A request to restructure a live campaign, switch bid strategy or chase a new audience goes into the plan, even when it arrives marked urgent.

The boundary that has protected the most work for us: we don't put a profitable campaign back into learning to test an idea. When a client wants more new customers quickly, we leave the existing campaign alone and build a separate one that excludes their customer list, so the proven campaign keeps earning while the new idea gets a fair test.

In sale weeks such as Black Friday we go further. We check accounts twice a day, adjust budgets, and make no structural changes at all. The opportunity still gets taken; it just runs in a lane where it can't break what already pays the bills.

Make Clients Rank Urgent Requests

DC

Dean CurrallCEO, Chief Marketing Officer, Investor · Castle International

When a client keeps sending urgent requests, we ask them to number their requests in order of priority inside Asana, our task management system, and we send the full list back to them.

Say they've put in two or three urgent requests and they keep doing it frequently. We send them a notification that makes them choose: "Do you want the urgent work to start now, which will delay this longer-term project by two or three days? Or do you want us to carry on, because maybe it isn't as urgent as you first thought?" A common trait with clients like this is that the work isn't necessarily urgent. They just want it now, so they call it urgent.

We also have a tagging system for tasks in Asana, and clients tag their own requests. When they go over a threshold and mark too many things as urgent, we say, "Right, you've given us five urgent tasks. Which one is the most urgent? You're giving us too many."

Once they see a visual of their own madness, they calm down. They say, "All right, I can't have five urgent fires at once." So we ask, "Which fire do you want us to put out first?" "Fire one." "No problem. Then what?"

You make the client think, rather than just doing it. If you simply do everything, you're telling them it's acceptable. I went down that route with clients for years. Now we use Asana as a tool to send it back to them.

Break Ties by Account Value

"If two requests are equally urgent and we can only do one today, I'll prioritise the client who pays us more. We're a business. Those larger retainers give us room to hire specialists, develop the team and keep delivering good results for clients over the long term." At Avaris Media, we plan work in 30-day sprints. Before I pull someone off a planned job, I ask, "What happens if this waits until tomorrow?" If a smaller client's Google Ads campaign has stopped running, that comes ahead of a report for our biggest account. The campaign is losing time right now. Likewise, if a client has a genuine opportunity that closes today, we decide whether it's worth moving something for. For routine requests, I'll reply straight away and give the client a realistic date. "I can get that to you on Thursday. Does that work?" Often it does. The client has an answer, the team can finish what it started, and when two pieces of work really do compete for the same slot, account value is how I break the tie. Nick Keeping, Founder, Avaris Media * avarismedia.com